ESTIMATION PARAMETERS OF POTENTIAL VERESOBORSKY MASSIF AREAS PRODUCTIVITY FOR PRIMARY Pt MINERALIZATION, MIDDLE URALS
DOI: 10.47765/0869-5997-2020-10019
Keywords:
primary Pt mineralization, dunite-clinopyroxenite-gabbro Kachkanarsky complex, Veresoborsky massif, Urals.Abstract
The analysis of statistically representative material of lithochemical sampling within Veresoborsky dunite massif revealed a group of correlating chemical elements (Cr, Mn, Co, Ni, Bi, Sn, W, Zn) whose accumulation trend coincides with that of Pt. The established pattern enables proposing criteria of comparative evaluation regarding primary Pt mineralization productivity of local areas (0,5–3 km2) in both Veresoborsky massif and its counterparts composed of the Urals Kachkanarsky complex (υO3k) rocks.
Downloads
Published
2020-11-24
How to Cite
Мотов Андрей Павлович, & Малах Юрий Ефимович. (2020). ESTIMATION PARAMETERS OF POTENTIAL VERESOBORSKY MASSIF AREAS PRODUCTIVITY FOR PRIMARY Pt MINERALIZATION, MIDDLE URALS: DOI: 10.47765/0869-5997-2020-10019. Ores and Metals, (3). Retrieved from https://rm.tsnigri.ru/index.php/main/article/view/89
Issue
Section
Prognosis, prospecting and exploration: Techniques and methods